Operation optimization of PLTMG SUMBAGUT 2 peaker 250 MW with homer
Abstract
Keywords
Full Text:
PDFReferences
. S. N. Edusainstek et al., “Analisis Konsumsi Bahan Bakar Pada Pembangkit Listrik Tenaga Uap Dengan menggunakan Metode Least Square,” Isbn, vol. 4, pp. 280–288, 2018.
. D. Keumala, A. Bintoro, H. Salahuddin, and Y. Muharry, “Analisis Penggunaan Rele Diferensial Sebagai Proteksi Transformator 66 MVA di PLTMG Sumbagut 2 Peaker Power Plant 250 Mw,” Jurnal Enegi Elektrik, vol. 10, no. 1, pp. 9–13, 2021.
. H. Suroso, P. Perdana, J. T. Elektro, F. Teknik, U. M. Gresik, and L. Multiplier, “Gas Dan Uap PT Petrokimia Gresik Dengan Metode Lagrange Multiplier,” pp. 1–9.
. T. Di, P. Mandangin, and J. M. T. Haryono, “[2] : 1.,” pp. 1–6, 1984.
. P. Beban and P. B. Tugas, “Makalah Seminar Tugas Akhir Mengoptimalkan Pembagian Beban Pada Unit Pembangkit PLTGU Tambak Lorok Dengan Metode Lagrange Multiplier”.
. Z. Tamam, “Karakterisasi Unjuk Kerja Mesin Diesel Generator Set Sistem Dual Fuel Solar dan Syngas Batubara Zuhri,” Journal of Chemical Information and Modeling, pp. 1–142, 2015.
. R. L. Imani et al., “Optimasi Energi Terbarukan Pada Microgrid di Pulau Rakit Indramayu Menggunakan Homer,” Conference on Innovation and Application of Science and Technology (CIASTECH 2018), no. September, pp. 634–642, 2018.
. I. Razak, “Studi Kelayakan Pemasangan Pembangkit Listrik Energi Terbarukan Tenaga Hybrid (Studi Kasus: Desa Gadingsari, Dusun Wonoroto, Bantul),” 2019.
DOI: https://doi.org/10.52626/joge.v2i2.28
Refbacks
- There are currently no refbacks.
St. Teknik II, Reumpet, Krueng Barona Jaya sub-district (23370), Aceh Besar District, Aceh Province, Indonesia.
http://geutheeinstitute.com/