Operation optimization of PLTMG SUMBAGUT 2 peaker 250 MW with homer

M Mahlil, Andik Bintoro

Abstract


PLTMG SUMBAGUT 2 peaker 250 MW has 13 generator units in parallel so that it is able to provide power of 239 MW, the generating power capacity per engine unit is 18,407 KW, due to the power usage in the load always changing, the P3B must be able to regulate generator operations automatically , economically, every generator operation requires a large amount of financing, especially fuel usage, fuel usage is one of the things that needs special attention because around 60% of the total operating costs incurred are fuel costs, therefore this research aims to Optimizing load and fuel bearing generators in annual plant operations using Lagrange multiplier methodology is simulated in HOMER ENERGI software, the results of this research are a gas engine system consisting of 13 gas engine generators with a capacity of 18407 kW, obtaining optimal generator results at NPC prices (Net Present Cost) is the lowest, HOMER ENERGI software makes simulation calculations easier, the most optimal system design is based on the lowest total NPC of IDR 5,125,319,000,000.00 from 13 generators, only 6 optimal generator units can produce energy of 117,510,454 KWH per year with a Levelized Cost of Energy (Rp/kWh) of 2,040 and consuming 31,274,527 m3/year of fuel.

Keywords


Energy, Optimization, Software Homer, PLTMG, Power.

Full Text:

PDF

References


. S. N. Edusainstek et al., “Analisis Konsumsi Bahan Bakar Pada Pembangkit Listrik Tenaga Uap Dengan menggunakan Metode Least Square,” Isbn, vol. 4, pp. 280–288, 2018.

. D. Keumala, A. Bintoro, H. Salahuddin, and Y. Muharry, “Analisis Penggunaan Rele Diferensial Sebagai Proteksi Transformator 66 MVA di PLTMG Sumbagut 2 Peaker Power Plant 250 Mw,” Jurnal Enegi Elektrik, vol. 10, no. 1, pp. 9–13, 2021.

. H. Suroso, P. Perdana, J. T. Elektro, F. Teknik, U. M. Gresik, and L. Multiplier, “Gas Dan Uap PT Petrokimia Gresik Dengan Metode Lagrange Multiplier,” pp. 1–9.

. T. Di, P. Mandangin, and J. M. T. Haryono, “[2] : 1.,” pp. 1–6, 1984.

. P. Beban and P. B. Tugas, “Makalah Seminar Tugas Akhir Mengoptimalkan Pembagian Beban Pada Unit Pembangkit PLTGU Tambak Lorok Dengan Metode Lagrange Multiplier”.

. Z. Tamam, “Karakterisasi Unjuk Kerja Mesin Diesel Generator Set Sistem Dual Fuel Solar dan Syngas Batubara Zuhri,” Journal of Chemical Information and Modeling, pp. 1–142, 2015.

. R. L. Imani et al., “Optimasi Energi Terbarukan Pada Microgrid di Pulau Rakit Indramayu Menggunakan Homer,” Conference on Innovation and Application of Science and Technology (CIASTECH 2018), no. September, pp. 634–642, 2018.

. I. Razak, “Studi Kelayakan Pemasangan Pembangkit Listrik Energi Terbarukan Tenaga Hybrid (Studi Kasus: Desa Gadingsari, Dusun Wonoroto, Bantul),” 2019.